Can a turbine set its blade for the wind that is coming?
Case study 02 / 09
A model that predicts the right blade pitch from turbine sensor data, so the turbine produces more power.
01
Can a turbine set its blade for the wind that is coming?
02
Three simulated 250 kW turbines, every 10 minutes for six months. The paper used hourly data.
03
Linear regression: 33.95% error on the blade angle.
04
XGBoost predicts the angle. A second model learns only from its mistakes.
05
Error down 96.7%.
06
In the published paper: 841.54 → 1,019.41 kWh on a sample day.
07
DeepMind predicted 700 MW of wind 36 hours ahead. Its value rose about 20%.
Sources: Google DeepMind, 2019 ↗
08
Simulated data is clean. A working turbine is the real test.